posted Jun 5, 2019
by
Mike Halferty with City of Toronto - Urban Foresty Branch
This poster session presentation summarizes the process of developing the City of Toronto's Natural Environment Trails Strategy and its outcomes.
published Feb 2021
by
KOA Corporation, A Lochner Company
The City of Pasadena's Bikeways Analysis and Feasibility Study builds on the outreach and feedback received during the development of the City's Bicycle Transportation Action Plan.
posted Aug 23, 2021
This webinar will discuss the ins and outs of a feasibility study done on the 90-mile multi-use trail to interpret early California history in San Mateo County.
published Nov 2009
The purpose of this trail study is to investigate the feasibility of building a trail system that connects Jean and the I-15 corridor to the small rural town of Goodsprings and the historic alignment of the yellow Pine Railroad.
published Jun 2006
The objective of this study was to determine the type of pathway that would best satisfy the needs of the Village of Hoosick community.
published Mar 2021
The purpose of the Lower Saluda Greenway, a proposed 10.5-mile multi-use paved path along the north side of the Lower Saluda River, is to increase safe access to nearby parks, trails, and destinations, aid in short-trip multimodal travel, and increase regional connectivity and unity between the Lexington and Irmo areas with the communities of Columbia, West Columbia, and Cayce.
published Jun 2011
by
Vanasse Hangen Brustlin, Inc.
This feasibility study examined the development of a multi-use rail with trail along the State-owned railroad, as well as a number of alternate routes. This study does not recommend specific routes, but highlights the possibilities for further consideration by the involved individuals and communities.
published Dec 2013
by
IMBA Trail Solutions
IMBA Trail Solutions visited the Moose River Plains Wild Forest for one week in October of 2013 to conduct field research, meet with stakeholders, and to begin the process of developing a conceptual design for mountain bike use in the area. All of the designs presented in this report are conceptual in nature and have not been completely field verified. Additional work will need to be done in the field to finalize the designs of reroutes and proposed trails described in this report.
posted Jul 28, 2020
A detailed feasibility study for Mud Creek Greenway done in 2021.
published Aug 2008
This report sorts through the various choices for the most "economical and sustainable" types of trail surfacing options along the proposed Rio Grande Trail corridor from Belen to Sunland Park, New Mexico.